THE SEQUENCE OF A KITCHEN BUILD

  1. Demolition

  2. Framing and rough construction

  3. Plumbing rough-in

  4. Electrical rough-in

  5. HVAC adjustments (if needed)

  6. Inspections

  7. Insulation

  8. Drywall and patching

  9. Prime and paint

  10. Flooring installation

  11. Cabinet delivery and installation

  12. Countertop templating

  13. Countertop installation

  14. Appliance installation

  15. Backsplash installation

  16. Plumbing fixture installation

  17. Finish Carpentry

  18. Final paint and touch-ups

  19. Decorative lighting installation

  20. Final inspections